Kestrel

PS/26/96 - B741 Coal Glen Embankment – Slip Remediation

East Ayrshire Council · published Wed 2 Sep 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

Who holds it now

Last won by William Owen and Son in May 2026.

What you're up against

  • The last two awards went to different firms: this buyer has changed supplier before.
  • 3 different firms won this buyer's 3 awards for this kind of work since 2022.

From East Ayrshire Council's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The documents are on PCS-Tender, where the bid is sent too. It's free to register there.

The notice as published

Repair of existing highways embankment showing signs of slope instability by excavating out failed materials and replacing with engineered fill at a gentler regraded slope of 1V:3H with counterfort drainage; Repair of existing culvert through installation of a CIPP lining (Contractor designed); 10m extension of existing culvert with precast concrete box culvert (Contractor designed) to accommodate regraded slope; Construction of transition unit with manhole access at location where existing and extended culverts meet (Note: Manhole access chamber is to be Contractor designed); Construction of new outfall headwall (Contractor designed) with scour protection through installation of erosion control matting at outfall location; Widening of highway verges to 2m width on both sides of the highway with installation of verge marker posts and post and mesh fencing; Installation of highways surface water drainage system with direct outfalls to Coal Glen watercourse at northern inlet to existing culvert and to the transition unit between existing and extended culvert. Repair of existing highways embankment showing signs of slope instability by excavating out failed materials and replacing with engineered fill at a gentler regraded slope of 1V:3H with counterfort drainage; Repair of existing culvert through installation of a CIPP lining (Contractor designed); 10m extension of existing culvert with precast concrete box culvert (Contractor designed) to accommodate regraded slope; Construction of transition unit with manhole access at location where existing and extended culverts meet (Note: Manhole access chamber is to be Contractor designed); Construction of new outfall headwall (Contractor designed) with scour protection through installation of erosion control matting at outfall location; Widening of highway verges to 2m width on both sides of the highway with installation of verge marker posts and post and mesh fencing; Installation of highways surface water drainage system with direct outfalls to Coal Glen watercourse at northern inlet to existing culvert and to the transition unit between existing and extended culvert.