Kestrel

Helensburgh, Cardross, Dumbarton Cyclepath Active Travel Route - Phase 3: Developed & Technical Design

Argyll and Bute Council · published Mon 7 Sep 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

Who holds it now

Last won by Connected Transport Planning in Mar 2026.

What you're up against

  • The last two awards went to different firms: this buyer has changed supplier before.
  • 8 different firms won this buyer's 2 awards for this kind of work since 2023.

From Argyll and Bute Council's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The documents are on Public Contracts Scotland, where the bid is sent too. It's free to register there.

The notice as published

This tender is for Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath; linking the Helensburgh Waterfront segregated cycleway (OS Grid NS 29598 82259) to the existing section of the cyclepath adjacent to the A814 at the Red Burn (OS Grid NS 31655 81112), near the north-east corner of Morrisons Supermarket site, and will build upon the concept design developed for the majority of the route (Civic Engineers, 2025). Argyll & Bute Council wish to appoint an appropriately qualified and experienced design team to develop Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath project from the current concept design through Developed (RIBA Stage 3) and Technical (RIBA Stage 4) Design, and to be Principal Designer during construction (RIBA Stage 5). The project will require the successful tenderer to complete a range of survey, design and in-depth engagement work, including in-depth community, stakeholder and landowner engagement, topographic and utilities surveys, equality impact assessment (EqIA) and Preliminary Environmental Assessment (PEA) to ensure route(s) identified have strong community, neighbour and landowner support and that the design drawings for the route(s) are robust, deliverable and of a high quality. These will all be subject to engagement with the community, businesses, landowners, neighbouring landowners, Argyll and Bute Council, Strathclyde Partnership for Transport (SPT) and Transport Scotland. This tender is for Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath; linking the Helensburgh Waterfront segregated cycleway (OS Grid NS 29598 82259) to the existing section of the cyclepath adjacent to the A814 at the Red Burn (OS Grid NS 31655 81112), near the north-east corner of Morrisons Supermarket site, and will build upon the concept design developed for the majority of the route (Civic Engineers, 2025). Argyll & Bute Council wish to appoint an appropriately qualified and experienced design team to develop Phase 3 of the Helensburgh, Cardross and Dumbarton Cyclepath project from the current concept design through Developed (RIBA Stage 3) and Technical (RIBA Stage 4) Design, and to be Principal Designer during construction (RIBA Stage 5). The project will require the successful tenderer to complete a range of survey, design and in-depth engagement work, including in-depth community, stakeholder and landowner engagement, topographic and utilities surveys, equality impact assessment (EqIA) and Preliminary Environmental Assessment (PEA) to ensure route(s) identified have strong community, neighbour and landowner support and that the design drawings for the route(s) are robust, deliverable and of a high quality. These will all be subject to engagement with the community, businesses, landowners, neighbouring landowners, Argyll and Bute Council, Strathclyde Partnership for Transport (SPT) and Transport Scotland.