Kestrel

Calvay HA Roofline and RW/ Waste Pipework Replacements Framework2026

Calvay Housing Association · published Wed 9 Sep 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The documents are on Public Contracts Scotland, where the bid is sent too. It's free to register there.

The notice as published

The successful Candidate(s) will be selected to join a new framework Lot as one of the contractors responsible for the supply, installation and completion of design for replacement timber and/ or uPVC external soffits, fascias, verges, bargeboards, rainwater goods, waste pipework and all associated works/ alterations, fittings etc. within occupied closes/ houses at Various Addresses, Barlanark, Glasgow G33 The tender evaluation will comprise the SPD, your quality score for CDP; and the Contract Sum stated on the Form of Tender. The submitted SPD will assess the selection criteria as a pass or fail to identify contractors who pass by meeting the specified criteria. Only those contractors who achieve an SPD pass will have their tender quality and cost considered/ evaluated. The criteria for scoring will be to reach a total percentage score as follows: Price (tender)- deducting 1% from 100 for every percentage point each tender is in excess of the lowest tender, prior to weighting. Quality- Contractor Design Statement [CDP] scoring will be as follows: maximum 50 marks for completed proposals ranked in relation to the other candidates, based on the Employer’s stated aspirations/ requirements and the information provided by the candidate(s). The Contractor Design Statement [CDP] scores will be converted to a percentage, prior to weighting. Candidates with the three highest [and those tied in third place] ‘price/ quality’ scores, who also achieve a minimum CDP quality score of 70%, will be the successful candidate contractors for the Single Lot and may be offered to enter into a contract with the Employer. You must refer to the Instructions to Tenderers on page 3 of the Specification of Works for a detailed description of the requirements and process.