B8035 GRIBUN ROCKFALLS – TARGETED SCALING OF ROCK FACE
In plain English
The notice doesn't say
Who holds it now
Last won by Cairn Construction Ltd and Amalgamated Construction Ltd and D A MacDonald (Contractors) Ltd and 12 more in Apr 2025.
What you're up against
- The last award named 15 suppliers: it may be a framework, where many firms are chosen.
The notice as published
The project objective is the reduction of risk associated with the identified/immediate rockfall hazard. The overarching objective Argyll and Bute Council is to appoint a specialist geotechnical Contractor to execute targeted rockfall mitigation works on the B8035 road. The preferred design solution involves the systematic, targeted scaling of approximately 500 metres of the designated rock face to actively mitigate structural stability hazards to achieve the project objective of the reduction of risk associated with the identified/immediate rockfall hazard. The project objective is the reduction of risk associated with the identified/immediate rockfall hazard. The overarching objective Argyll and Bute Council is to appoint a specialist geotechnical Contractor to execute targeted rockfall mitigation works on the B8035 road. The preferred design solution involves the systematic, targeted scaling of approximately 500 metres of the designated rock face to actively mitigate structural stability hazards to achieve the project objective of the reduction of risk associated with the identified/immediate rockfall hazard.