NMMS – 108 kWp Ground-Mounted Solar PV – Multidisciplinary Design Services (RIBA Stage 4)
In plain English
The notice doesn't say
The notice as published
National Mining Museum Scotland (NMMS) invites tenders from suitably qualified multidisciplinary consultancy teams to undertake the technical design development of a proposed 108 kWp ground-mounted solar photovoltaic (PV) installation at Lady Victoria Colliery, Newtongrange, Midlothian. The commission will progress the proposed Phase 1 installation to RIBA Stage 4 (Technical Design), including PV system design, electrical infrastructure and main switchboard assessments, grid connection coordination, underground services surveys, structural and foundation design, architectural and heritage considerations, statutory approvals, cost planning and construction procurement documentation. The project is funded through the Community and Renewable Energy Scheme (CARES). The available budget is GBP 57,546.50 excluding VAT. The commission is anticipated to commence in December 2026, with final coordinated deliverables required by 5 March 2027. Full details of the scope, submission requirements and evaluation criteria are provided in the Invitation to Tender and accompanying appendices. National Mining Museum Scotland (NMMS) seeks to appoint a suitably qualified multidisciplinary consultancy team to progress the technical design of a proposed 108 kWp ground-mounted solar photovoltaic (PV) installation at Lady Victoria Colliery, Newtongrange, Midlothian, to RIBA Stage 4. The commission includes PV system design, electrical infrastructure and main switchboard assessments, grid connection coordination, energy monitoring and control considerations, underground services surveys, structural and foundation design, architectural and heritage considerations, statutory approvals, quantity surveying, cost planning and preparation of construction procurement documentation. The proposed installation forms Phase 1 of the museum's wider Energy Development Plan. The project is funded through the Community and Renewable Energy Scheme (CARES). The available consultancy budget is GBP 57,546.50 excluding VAT, inclusive of expenses and specialist inputs. The anticipated appointment period is December 2026 to 5 March 2027. The commission covers design and consultancy services only and does not include the construction or installation of the PV array. Full details of the scope, deliverables, programme, submission requirements and evaluation criteria are provided in the Invitation to Tender and accompanying appendices.