Kestrel

Decarbonising Community Spaces Programme – Northbay Hall and Gàradh a’ Bhàgh a’ Tuath

Voluntary Action Barra and Vatersay · published Fri 27 Nov 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The documents are on Public Contracts Scotland, where the bid is sent too. It's free to register there.

The notice as published

This notice relates to the design, provision, delivery, installation and commissioning of the following works at Northbay Hall and Gàradh a’ Bhàgh a’ Tuath (The Gàradh): Upgraded windows and external doors at Northbay Hall. Electrical distribution upgrades at Northbay Hall and The Gàradh. Sunamp hot-water and thermal-storage provision at Northbay Hall. A new wet heating system at Northbay Hall, including radiators and air curtains. Intelligent heating controls at Northbay Hall. A new electrical supply and data link between Northbay Hall and The Gàradh. A dedicated 20-kW / 40-kWh grid-connected battery energy storage system, physically located at The Gàradh beside the existing system. A 12-kW coastal-grade air source heat pump at The Gàradh. Intelligent heating controls and zoning, improved café hot-water capacity and an ATS control panel at The Gàradh. Wind-turbine diversion-load control, electrical distribution improvements and high-heat-retention storage heaters with renewable-diversion control at The Gàradh. All necessary ancillary installation materials, civil works, making good, controls, protection and commissioning tasks. This notice relates to the design, provision, delivery, installation and commissioning of the following works at Northbay Hall and Gàradh a’ Bhàgh a’ Tuath (The Gàradh): Upgraded windows and external doors at Northbay Hall. Electrical distribution upgrades at Northbay Hall and The Gàradh. Sunamp hot-water and thermal-storage provision at Northbay Hall. A new wet heating system at Northbay Hall, including radiators and air curtains. Intelligent heating controls at Northbay Hall. A new electrical supply and data link between Northbay Hall and The Gàradh. A dedicated 20-kW / 40-kWh grid-connected battery energy storage system, physically located at The Gàradh beside the existing system. A 12-kW coastal-grade air source heat pump at The Gàradh. Intelligent heating controls and zoning, improved café hot-water capacity and an ATS control panel at The Gàradh. Wind-turbine diversion-load control, electrical distribution improvements and high-heat-retention storage heaters with renewable-diversion control at The Gàradh. All necessary ancillary installation materials, civil works, making good, controls, protection and commissioning tasks. The overall system should improve how electricity from The Gàradh’s existing wind turbines and solar PV is stored, managed and shared across both sites. It should support on-site energy use, reduce grid dependency and curtailment, improve operational resilience and provide appropriate load management. While indicative capacities are provided above, bidders are invited to propose alternative configurations where these would better meet the sites’ energy profiles, operational needs or grid constraints. Any alternative must be clearly justified and priced. The contractor will be responsible for identifying and completing all necessary grid-connection applications, notifications and approvals with SSEN, as required by the final system design. This includes confirming the correct application pathway and ensuring that export capacity, protection settings, metering arrangements and the inter-site electrical connection comply with all applicable technical and safety requirements. The overall system should be designed to work with the existing renewable-generation, battery and monitoring equipment at The Gàradh and to allow for potential future additions or enhancements, where practical, without committing to a specific future configuration.. Further details are provided in the Invitation to Tender document.