National Grid Substation Construction
In plain English
The notice doesn't say
The notice as published
This QUDM is for substation construction, mechanical and electrical installation and major civil works. To effectively and efficiently deliver the capital works required to meet our Electricity License obligations, manage the risk on our electricity transmission network and to connect new customers, Scope for Lot 1: EPC Substation Construction Suppliers in lot 1 shall compete for stand-alone contracts and/or frameworks and shall be responsible for delivering capabilities from the following illustrative list, specific to working within a live high-voltage (up to 400kV) transmission network substation environment: · Detailed electrical and civil design · Construction Design Management (CDM) · Programme management · Project management · Site management, including acting as Principal Contractor under the CDM Regulations · Procurement and supply chain management · Subcontractor management · Civil engineering · Protection and control systems installation, configuration and commissioning · Mechanical and electrical installation, testing and commissioning An illustrative list of work types included within this lot is as follows (this list is subject to change due to changing or emerging requirements throughout the QUDM period) · New Build AIS/GIS · AIS/GIS Substation Extension · Major AIS/GIS Substation Asset Replacement Operators that are successful in securing a position on lot 1 of the QUDM may be required to procure products that are to be selected from a list of suppliers that has been pre-approved by National Grid, to accept free-issue equipment and services supplied from contracts that National Grid has placed, or to accept the novation of such a contract after it has been placed by National Grid, for example: · Power transformers · Protection and Control · Gas Insulated Switchgear (GIS) · Air Insulated Switchgear (AIS) · Consumables This lot is designed for larger, more complex works requiring a traditional full EPC turnkey approach to delivery of the scope, with typical project estimates being >£20million. Scope for Lot 2: Mechanical & Electrical Installation Suppliers in lot 2 shall compete for stand-alone contracts and shall be responsible for delivering capabilities from the following illustrative list, specific to working within a live high-voltage (132kV~400kV) transmission network substation environment: · Detailed engineering and civil design, including primary and protection and control design · Construction Design Management (CDM) · Programme management · Project management · Site management, including acting as Principal Contractor under the CDM Regulations and temporary works management · Procurement and supply chain management · Subcontractor management · Civil engineering · Protection and control systems installation, configuration and commissioning An illustrative list of work types included within this lot is as follows (this list is subject to change due to changing or emerging requirements throughout the QUDM period) · Substation Upgrades / Smaller Extensions · AIS/GIS Substation Extensions · AIS/GIS Substation Asset Replacement Operators that are successful in securing a position on lot 2 of the QUDM may be required to procure products that are to be selected from a list of suppliers that has been pre-approved by National Grid , to accept free-issue equipment and services supplied from contracts that National Grid has placed, or to accept the novation of such a contract after it has been placed by National Grid, for example: · Power transformers · Protection and Control · Gas Insulated Switchgear (GIS) · Air Insulated Switchgear (AIS) · Consumables This Lot is designed for relatively smaller and less complex works than Lot 1 whereby a competent installer or medium sized construction supplier would have the ability to deliver the scope of work, and typical project estimates would be less than Scope for Lot 3: Major Civil Suppliers in lot 3 shall compete for stand-alone contracts and/or frameworks and shall be responsible for delivering capabilities from the following illustrative list for Substation major civil works with typical project estimated greater than >£5million. Scope shall include but is not limited to, the following illustrative types of works: · Project & Programme Management: · Ensure sufficient and competent resources are deployed on the project to deliver the project in accordance with all National Grid standards and specifications. · Liaison with and management of the interface with any affected landowner, statutory body or undertaker during the delivery of the works (e.g., Local Highways Authority, Network Rail, Environment Agency, Distribution Network Operators). · Consultation & Engagement: · Support the Client in the development of consultation materials as required · Attend and present at consultation events and support the preparation of consultation responses · Support the Client at any technical stakeholder meetings · Input into Consultation Report, liaise with Consents Integrator and engage with consultees as required · Coordinate with Lands Team for survey access · Assist with S172 evidence compilation and other requirements. · Surveys: · Planning, management, delivery and reporting of all surveys required to support the project at all stages of its lifecycle, including: · Site walkover surveys to verify desktop work · Borehole surveys · Perform soil surveys · Intrusive surveys (e.g., foundation inspections). · Existing asset surveys. · Earthing surveys. · Utility surveys · Traffic surveys including vehicle volume and speed surveys. · Design: · Development of outline design, associated drawings and technical reporting required for inclusion within the planning and/or consent application and the construction works information · Production of design, which is in accordance with the Client's requirements, eliminates hazards as far as reasonably practicable for the whole life of the assets, facilitates a safe and efficient construction phase and gives due regard to Client's environmental and sustainability requirements. · Support the Client at any technical stakeholder meetings · Enact the role of Principal Designer in accordance with the CDM regulations 2015 for the development and/or delivery phase and formerly appoint the Principal Designer Representative as required · Review the System Design Specification for completeness and identify any gaps · Review any design works prior to engagement to understand any limitations and restrictions to be carried forward into the subsequent design stage, · Discharge relevant conditions associated with any approved planning permission and/or consent to ensure these are factored into the detailed design · Proactively engage and share design information with other design disciplines involved in the project(s) to ensure that all requirements are considered such that a robust, holistic design can be achieved. · Effectively manage design change ensuring that appropriate communication channels are maintained and document/drawing version control well established. · Responsible with others at the point of known design interfaces (i.e., HV Substation, HV OHL, HV Cables, etc.) and/or with other parties (i.e., Bulk Purchase Equipment (static wound equipment), Generators, DNO, etc.) to ensure that their project design is the most cost-effective solution which does not compromise any other party's programme and objectives in compliance with the duties and responsibilities identified by current CDM Regulations. · Design management and coordination to reduce interface risk. · Building Permanent Structures: The design and construction of new permanent buildings including but not limited to: · Switch Halls for Gas Insulated Switchgear and other equipment contained therein. · Ancillary Plant Room Buildings. · Office & Amenities Blocks. · Storage and Workshop Units · Building Services: Building services required for any new build or refurbishment work (e.g., heating / cooling, ventilatio