Kestrel

Tx8 & Tx9 Transformer and Switchgear New Building - Retender

The Pirbright Institute · published Fri 28 Aug 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

Who holds it now

Last won by Re-Gen (M&E Services) Ltd. in Jun 2026, for £125k.

Award notice: Installation of CVIM Generator Back Up Power

What you're up against

  • It last went for £125k in 2026.

From The Pirbright Institute's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The documents are on In-Tend, where the bid is sent too. It's free to register there.

The notice as published

The building of a new enclosure over existing housings which contain the High Voltage (HV) Transformers, known as Tx8 and Tx9, together with the Low Voltage (LV) Switchgear which converts the HV supply into LV power which can be fed into the distribution boards in the buildings they serve. This would safeguard the electrical supply not only to the BBSRC National Vaccinology Centre, the Jenner Building (Jenner), and the new Centre for Veterinary Vaccine Innovation and Manufacturing (CVIM), but also to any future developments and facilities requiring an electrical supply from either Tx8 or Tx9.